Transforming the metropolis of São Paulo
The Itapaiuna Bridge is a three-lane overpass stretching 340 m in length, which will alleviate traffic conditions in newly built residential areas. Facing the impossibility of building conventional shoring systems on the ground, with a distance of 113 m between riverbanks to span, the construction firm ODEBRECHT decided on a construction system as cost-efficient and lightweight as possible. In coordination with headquarters, the ULMA Brazil engineering team developed a solution employing our CVS cantilever formwork carriage, a flexible, high-performance system with a high load-bearing capacity and capable of adapting to varied deck widths.
Independent from the structural elements of the construction system employed, ENKOFORM HMK bridge deck formwork adjusted perfectly to the varied deck widths along the entire 340 m length of the bridge.
In addition to supplying more than 1,400 tonnes of equipment, ULMA also provided engineering services covering implementation, pre-assembly, on-site assistance, and supervision throughout the project.