The first step in the modernisation for PETROPERÚ
The Modernisation Project for the Talara Refinery envisions the creation of new productive units and the implementation of new systems and procedures that will increase both capacity and efficiency.
New Hotel in the Manhattan Financial District
Over the past decade, innovative buildings have been literally transforming the landscape of finance in New York City.
High Speed Rail Network, Spain
In the face of both precipitous terrain and strict requirements for railway construction, we relied on the flexibility and versatility of ULMA formwork systems to meet the challenges presented.
Sustainability in the center of Warsaw
ULMA self-climbing systems made it possible to complete the two cores of EuroCentrum Complex building quickly and efficiently.
Arch bridge over Stradomka River
In order to build this bridge, it’s been employed shoring systems of different heights, thus achieving high levels of efficiency throughout the entire construction process.
ULMA takes part on the newly-opened Wanda Metropolitano Stadium in Madrid
The transformation of the old stadium La Peineta designed for 20,000 spectators into state-of-the-art facilities for 68,000 is a great technical and logistical challenge. The challenge was overcome thanks to careful planning and efficient material rotation.
Tight deadlines and quality standards for Schaumburg Clinic, Germany
Using the CC-4 formwork system it has been able to pour 30,000 m3 of concrete in situ in little more than 6 months.
Construction in record time with T-60 Shoring Towers: Lusail Boulevard Tunnel, Qatar
This project consists of the construction of a cut-and-cover road-rail tunnel, including the mechanical systems and services necessary for the A3 Expressway. The tunnel stretches 655 m in length, and is 45 m wide with three separate tubes. The central tube is dedicated to rail traffic, with two lines running in each direction. The project required 300,000 m³ of concrete.
Javier Prado Tower, a Sustainable Building in Lima
Located in the financial centre of Peru, this commercial tower measures more than 90 m in height, making it one of the tallest buildings in Lima. It features 27 floors aboveground with cutting-edge design, along with nine stories belowground covering 82,401.32 m².
New York’s first and only retail shopping destination
Situated at the Staten Island Ferry Terminal, a 20-minute boat ride from Manhattan, Empire Outlets is set to become the retail centrepiece of New York City.
Wide range of MK System capabilities at Interlomas Viaduct, Mexico
Forming part of Mexico City’s transportation infrastructure development plan, this viaduct reaches 227 m in length to connect the residential and commercial area Interlomas with the Naucalpan-Toluca Motorway.
ULMA comprehensive solutions for the expansion of the Jaworzno III Power Plant
The new addition to Jaworzno III Power Plant, Poland, will boast a 910 MW production capacity.
ULMA Solutions for the Widest Tunnel on the Iberian Peninsula
Measuring 19.2 m in width, this mine tunnel is to become the widest on the entire Iberian Peninsula.
Detailed technical study of the unique building geometry
Before assembling the multidirectional BRIO scaffolding, there’s been undertook a detailed technical study of the unique building geometry, so as to adapt to it as efficiently as possible.
Comprehensive formwork and scaffolding systems at Riyadh Metro
Riyadh is a Saudi Arabian city that – like any big city anywhere in the world – is home to a high density of vehicular traffic. An underground rail network was built in order to reduce traffic and improve both access to and communication between the city centre, the airport, and the financial district.
Spectacular views of Manhattan from Harborside Tower
A series of buildings are being constructed along the banks of the Hudson River with spectacular views of Manhattan. The Harborside Tower was designed with 69 storeys, 763 residences, and a total height of 214 m. It is now the tallest residential building in New Jersey.
Hisgaura Bridge, the longest cable-stayed bridge in South America
Traversing challenging terrain, the development project along the Málaga—Los Curos Motorway will improve transportation between the regions of Boyacá and Santander, Colombia. The central element of these improvements is the Hisgaura Bridge, stretching 653 m in length with a single span reaching 400 m, will become in 2018 the longest cable-stayed bridge in South America.
New Lock on the Po River, Italy
Meticulous study and planning paired with careful ULMA product rotation provided for optimal performance and a reduction in the tasks necessary to perform in situ.
New Safe Confinement at nuclear plant in Chernobyl, Ukraine
A new sarcophagus was built to confine radioactive leakage from the abandoned Chernobyl reactor complex. The New Safe Confinement (NSC) is an arched structure of concrete and steel measuring 150 m long, 257 m wide, and 109 m tall.
Duplicate CVS Form Carrier Technology in Poland
The Polish infrastructural development plan has drastically increased the number of new civil engineering projects being undertaken nationally. ULMA Poland team is currently finishing various bridges with the in situ cantilever method, most notably the MS-4A Bridge over the Oder River and the MS-30.1 Bridge, spanning across the banks of the Drwęca River.
New office building Eschborn, Germany
The Eschborn industrial park is slated to be home to the headquarters of various multinational corporations and government agencies. As part of an effort to spur local economic development, two significant office buildings are being built in the southern part of Germany, one of which is the 'Bauteile, Management Circle und Zühlk', featuring more than 10,000 m² of total space and a car park for 200 vehicles.
State-of-the-Art Flats in Chile
Chile has more seismic activity than any other country in the world, a fact that makes construction regulations not only extremely strict but subject to continual revision. The criteria set out in regulations must be followed for all construction projects in the country, regardless of the building’s final purpose.
Atlantic Station Mixed-Use Development, U.S.A.
The Atlantic Station Project will transform the old Stamford, CT Post Office building into a mixed-use development with spectacular views of Manhattan and Long Island. The complex comprises a dynamic retail and restaurant area set underneath two tower blocks reaching 21 and 29 storeys tall, respectively, as well as a car park for more than 800 vehicles.
Formwork and Scaffolding ULMA for the largest Water Treatment Plant in all of Central Europe
The new water treatment plant in Prague is the biggest project in the Czech Republic currently underway, and when completed will be the largest facility of its kind in all of Central Europe.
ULMA offers flexible solutions for Dubai City Walk Project
ULMA has offered rapid, simple, and, most importantly, flexible solutions for this project composed of extremely diverse slab thicknesses and heights.
Formwork technology for the incremental launching method for two bridges in Poland
Within the frames of road investments planned in Poland to the year 2020 the number of bridge-type works made with the use of the incremental launching method has substantially increased. ULMA has recently undertaken the design and delivery of a special formwork which allows applying the incremental launching technology to construct two bridges: MS-6 viaduct on the S5 road and the E-1 Bridge on the S19 road, located in Poland.
ULMA Formworks for special geometry piers
The versatility of the formwork structures provided a solution both profitable for our client and efficient for the construction of the octagonal piers required in Mexico – Toluca Intercity Train project.
Innovative Solutions of formwork in Avant-Garde Architecture
The Fondazione Prada Museum, designed by the architect Rem Koolhaas, attempts to integrate traditional and avant-garde architecture in a single space.
Discover the Many Faces of ULMA in Our New Corporate Video
This video represents the latest development in ULMA media communications, following closely behind the publication of Construction Book. With compelling audiovisuals and illustrative graphics, both productions convey our identity, our values, and our way of working.
ULMA Comprehensive solutions in Venda Nova III dam, Portugal
When more than 2,000 t of material is mobilised, when extremely versatile construction systems are needed, and when the speed and simplicity of assembly is crucial, experience is absolutely fundamental to success.