Description
This factory is part of the TECHINT Steel Project in Mexico, which includes two more plants in Veracruz and Monterrey. On commissioning, TECHINT will become the largest producer of seamless steel pipes in Latin America.
ULMA Solution
ULMA 100% satisfied the requirements of ergonomics, safety and load. For this reason, ULMA became the sole supplier of modular scaffolding, including its erection, for the entire construction process, in addition to taking over maintenance of the plant.
All kinds of scaffolding were erected: access stairs, hanging scaffolding, pedestrian bridges, working scaffold towers and other scaffolding adapted to the different geometries of the facilities.
Maximum height of access towers: 40 m
Maximum height of working scaffold: 20 m
BRIO Modular Scaffolding, as best example of safety and operability, and the continuous training of staff on site provided the perfect tool for the required job.