Processing plant for the classification of rocks, Retzstadt, Germany

Sequential climbing on different structures
This is a gravel mill for a quarry near Würzburg. It includes 10 silos with an area of 5 x 6 m each and 15 m height. The total silo volume is 350 m³.

Description

This is a gravel mill for a quarry near Würzburg. It includes 10 silos with an area of 5 x 6 m each and 15 m height. The total silo volume is 350 m3.

ULMA solution

The first tier is 6.5 m high with side walls and front openings. Afterwards, two similar climbing stages of 4.25 m were performed.

The inside shafts were built with 5.9 m wide KSP Shaft Platforms with MK-180 walers and folding brackets. The CR-250 climbing bracket worked as platform and climbing support for ORMA vertical formwork equipped with roll-back carriages for stripping. Platforms and formwork moved to the next silo without changing its configuration and according to the planned construction process.