Description
Its 55,000 m2 of area for rent converts Tower Bridge into one of the largest shopping centres in the metropolitan area.
The building periphery is divided into three sections of about 2,000 m2, with 5 basement levels. The projected area of the building is 2,400 m2, to a total built floor area of 138,000 m2.
ULMA Solution
The project included aspects such as passageways for the movement of people or perimeter working platforms.High efficiency construction systems were chosen with pouring cycles of 7 days for an area of 2,400 m2. This required the SP Prop as back-propping system of high load capacity.
G Shoring suited the formwork support at great heights and enabled the early removal of the slab formwork for the use of the same material in successive stages. The foundation was built with COMAIN Handset Formwork.
ULMA maintained its ongoing support by the technical training of workers and by monitoring the entire construction process.