Skip to content. | Skip to navigation

News

Keep up to date on our latest project and product developments.

ULMA’s CC-4 Shoring System in the Creative Heart of the Meatpacking District

61 Ninth Avenue will sit in a growing area for high tech firms adjacent to Apple's Flagship Store on Ninth Avenue and West 15th Street and across the street from the Chelsea Market and Google's NY headquarters.

Jul 13, 2017

Javier Prado Tower, a Sustainable Building in Lima

Located in the financial center of Peru, this commercial tower will measure more than 295 ft. in height, making it one of the tallest buildings in Lima. The tower features 27 floors above ground with cutting-edge design, along with nine floors below ground covering an area of 886,950 SQF.

Jul 10, 2017

MK Systems at South Beach Psychiatric Center in Staten Island

South Beach Psychiatric Center, like many of the residences and businesses in the Ocean Breeze neighborhood, was devastated by Hurricane Sandy in 2012.

Apr 20, 2017

ULMA's Hydraulic Windscreen System HWS provides safety and protection for the Modern II

As the centerpiece of the enhanced downtown district in Fort Lee, The Modern is comprised of two identical 47 stories 498 foot glass clad towers (The Modern and The Modern II), each containing 450 luxury rental residences and offering breathtaking views of the George Washington Bridge, Manhattan and the Hudson River. This transformation of Fort Lee’s downtown is also part of the Hudson Lights project.

Mar 24, 2017

Duplicate CVS Form Carrier Technology in Poland

The Polish infrastructural development plan has dramatically increased the number of new civil engineering projects being undertaken nationally. ULMA Poland team is currently finishing various bridges with the in situ cantilever method, most notably the MS-4A Bridge over the Oder River and the MS-30.1 Bridge, spanning across the banks of the Drwęca River.

Feb 08, 2017

ULMA Concrete Forming and Shoring Products Play Key Role in Upgrade of Water Treatment Facility

The Maryland Correctional Institution, located in Hagerstown, is one of Maryland’s medium-security facilities.

Jan 26, 2017

Formwork and Scaffolding ULMA for the largest Water Treatment Plant in all of Central Europe

The new water treatment plant in Prague is the biggest project in the Czech Republic currently underway, and when completed will be the largest facility of its kind in all of Central Europe.

Jan 09, 2017

ULMA Form Works provides shoring and forming for the Empire Outlets - New York City's first and only shopping outlet

ULMA’s new MEGAFRAME frame shoring system provides versatility and high productivity in the centerpiece in New York City's newest entertainment district.

Nov 08, 2016

ULMA’s new FORMADECK Drop Head Shoring System at Atlantic Station in Stamford, CT

A mixed-use development, where ULMA provides the slab formwork.

Oct 31, 2016

ULMA to Make Strategic Investment in Socon, an Atlanta Based Company

NEW Capital to spur Formwork and Shoring Growth for the South Eastern U.S. Construction Markets

Aug 01, 2016

A Solution for Every Market

Over 50 years’ experience has shown us that each market and each country has its own ways, methods, and peculiarities in construction.

Jun 20, 2016

Discover New Developments in the Showroom

All of our latest product developments are already on display in the Showroom so that the customer can get to know the latest market releases first hand.

Jun 08, 2016

Safety, Ergonomics and Innovation: The perfect equation that translates into high-performance solutions on site

ULMA accompanies each client from the start of every project until its final construction, studying the options for each site, designing the technical solution for formwork and shoring and providing the most suitable construction material, together with the safety systems that help to prevent possible incidents during the construction on site.

Apr 22, 2016

The Key to Innovation: Close Customer Relations

We transform our clients’ needs into new products, new solutions, and new customer services. Every year we develop new and improved products, the quality of which clearly demonstrates the effectiveness of close collaboration with our customers. This is the way to remain on the cutting edge of research, creating ever-more advanced and efficient formwork and shoring systems, tailored to both customer and market requirements.

Mar 31, 2016

CVS, cutting-edge bridge technology

The list of MK system applications is ever growing

May 20, 2015

Energy projects in Peru

ULMA has many years of experience, a wide scope of expertise in this area and has carried out a considerable number of projects in Peru.

Jan 08, 2015

MK mine tunnel carriages

Flexible and cost-effective solution with a standard product. MK System applications are multiplied.

Nov 20, 2014

Gantry false work on heavy-duty MK shoring towers for the load-carrying structure

The two-lane, seventeen span and almost 950 meters long ES 5.5 overpass was built within the S-8 expressway in Poland, between the Walichnowy and the Wrocław junctions. Its load carrying structure consists of a prestressed box, divided into four segments with expansion joints.

Sep 23, 2014

ULMA Showroom - 1,700 sq metres of product and experience

The Showroom is ULMA's shop window for products, capabilities and a place for training and learning.

Jul 18, 2014

ULMA & ATTIEH alliance: interview with Nouri A. Daher

Nouri A. Daher, General Director of ULMA ATTIEH is now working for 6 years side by side with ULMA. The fruits of this partnership are large projects such as the Briman Project, Damman Project, etc.

Jul 17, 2014

ULMA launches the most optimised light formwork solution into the market

The light LGW formwork is the result of turning research and innovation into new products, new solutions and new services for the customer.

Jun 09, 2014

Great Performance in Great Projects

ULMA participates in what is considered to be the largest infrastructure plan in recent times in Recife, Brazil. The Via Mangue motorway is a collaborative project between the Municipal Prefecture of the City of Recife and the Federal Government within the works on mobility for the Football World Cup 2014. The plan includes the construction of roads, sanitation, residential areas, etc. with an investment of R$ 433.2 million (about € 137 million).

May 26, 2014

HWS and ATR - Partners at great heights

High-rise projects require an industry leader to come up with excellent product solutions and shortest possible execution deadlines. ULMA has been working for years in this sector offering staff expertise in the development, application and advice to customers at an international level. This know-how rounded off with a comprehensive, customised and continuous service from the beginning up to the end of each project ensures the success of this type of projects. Customers relying on ULMA made it possible to implement projects, such as the Hudson Yards in NYC and Bay Adelaide East Tower in Toronto.

May 26, 2014

Building Modernity in India

ULMA's presence in the Asian market is a reality for years. The opening of the subsidiary in India in 2010 was a further step towards offering a comprehensive service and a close relationship with the customer in that region. ULMA positions itself in the Asian market with high-rise building projects. The Prestige Trade Tower in Bangalore and the World One King Tower in Mumbai are examples of projects currently undertaken by ULMA in this country.

Feb 13, 2014